Production plan vs actual output
A production plan sets intended quantities and dates. Actual output records what was completed and when.
- Author
- Seung-joo Park
- Reviewer
- Seung-joo Park
- Last updated
The companies, items and codes in this article are fictional examples for teaching.
How we write and reviewApplying the rule
All 20 assemblies were posted as finished although only 16 passed final inspection. The correction left 16 finished and restored 4 awaiting inspection to WIP.
A fictional example from the companion lesson
- Situation
- Fictional example · The Hanbit Stationery production team skipped assembly and packed cut parts directly. Finished counts rose, but unassembled parts piled up between steps and the books stopped matching the floor. (Quantities are made-up teaching numbers.)
- Result
- Skipping steps makes WIP vanish from the books and finished goods look higher than they are, so cost and stock go wrong.
Production plan vs actual output at a glance
| Criterion | Production plan | actual output |
|---|---|---|
| Purpose | Set targets | Measure output |
| Reference | Schedule | Completion entry |
| Check | Material availability | Good and defective |
| Exception | Reschedule | Correct entry |
Frequently asked questions
What evidence supports the production plan side of the comparison?
Use the schedule and check material availability.
How should the example in this article be handled?
The correction left 16 finished and restored 4 awaiting inspection to WIP.
If we skip a step, won't finished goods rise faster?
Work-in-progress is unfinished goods between steps. Input, output and WIP must add up for the books to match the floor.